Group Created with Sketch.
Volume 24 No. 116
  • Created with Sketch.
  • Created with Sketch.
  • Created with Sketch.

Ravens Unveil First Phase Of M&T Bank Stadium Upgrades

The Ravens today unveiled the first installment of a two-year, $35M upgrade project at M&T Bank Stadium that includes improvements to video boards, concession stands and concourses. Two 8-by-30-foot HD LED boards were installed at the concourse entrances of gates A and D, with four more new LED boards in the stadium's lower bowl. The lower concourses have been designed with a "Ravenized" theme inspired by the look of the stadium's exterior (Ravens).

Watch a video highlighting the upgrade project.