Currency Converter

Enter amount in full numerical value, without currency symbol or commas (ex: 3000000).

From:
To:
 

SBD Global/November 7, 2012/Facilities

Arena Pernambuco Construction Plans Altered To Have Stadium Ready For Confederations Cup

WANT MORE GREAT STORIES LIKE THIS?

CLICK ON ONE OF THESE BUTTONS

ALREADY A
SUBSCRIBER?
SEE IF
YOU LIKE IT
GET IT ALL
(PREMIUM ACCESS)
The consortium in charge of the Arena Pernambucu in Recife, Brazil, has "opted to alter the project" to speed up construction and get it ready for the 2013 Confederations Cup in June, according to Itri & Rizzo of FOLHA DE S. PAULO. This is significant as the Confederations Cup is set to take place in June. The roof and the façade of the stadium will both see changes "in the material used and the construction process." The façade, which was supposed to be constructed from aluminum panels and glass, will now be made "with a plastic membrane similar to the one used at the Allianz Arena in Munich." The stadium itself will have "a rounder format" than the original project suggested. The changes "should increase the cost" of the stadium, which already stands at R$532M ($261.6M), but the arena will now be ready for April instead of Dec. '13 (FOLHA DE S. PAULO, 11/6).
Return to top

Related Topics:

Brazil, Facilities

Video Powered By - Castfire CMS Powered By - Sitecore

Report a Bug