Currency Converter

Enter amount in full numerical value, without currency symbol or commas (ex: 3000000).


SBD Global/September 14, 2012/Facilities

Facilities Notes: Paragon Secures Olympic Museum Contract

London-based Paragon Entertainment has won the contract to "design, develop and fit out" The Olympic Museum in Lausanne, Switzerland. The project worth £4.8M ($7.7M) is to be delivered over the next 14 months (, 9/12). ... The latest construction reports revealed that the Mané Garrincha Stadium in Brasilia is now 72% finished. The 2014 World Cup arena will sit 71,000 and has an estimated cost of R$800M ($395M) (, 9/12).
Return to top

Related Topics:


Video Powered By - Castfire CMS Powered By - Sitecore

Report a Bug